DHA Pollution Control - for environmental and waste water engineering services.
DHA Pollution Control - for environmental and waste water engineering services.
REED BED PROJECT
  Commercial Reed Bed application catering for a public house
  The following pictures show the construction of a Reed Bed Scheme catering for 80 full time population equivalent.
  Reed Bed Project Pic 1 Reed Bed Project Pic 2
  Reed Bed Project Pic 3 Reed Bed Project Pic 4
  Reed Bed Project Pic 5 Reed Bed Project Pic 6
  In the last picture the reeds are 2 weeks old. They will grow to 1-2 metres after the second growing season as the following pictures of another scheme show
  Reed Bed Project Pic 7 Reed Bed Project Pic 8
  First planted.... 3 weeks later.....
  Reed Bed Project Pic 9 Reed Bed Project Pic 10
  4 months later...... 12 months later.
     
 
Further details are available on request from:
DHA Pollution Control
Woodlands
4 Holly Close
Alveston, Bristol
BS35 3PW
01454 418880
Main Index Intro Services Reed Bed Treatments Golf Course Irrigation Mechanised Sewage Treatment Email here
H2O logo Information on D.H.A. Pollution Control Web Site is © Copyright 2001-2008
Any copying or reproduction without permission is strictly prohibited
This site was designed by Imagine IT